Project 5 – Project Plan
This document provides an overview for all the case studies presented in this project, and outline deliverables that are required, with an initial schedule.

Project Title

Triple Cases

Team Name

Group 13

Team Members
Chenglin Fan

Feng Zhu (PM)
Josh Merritt
Rohit Ahuja
Shuo Huang
Yi Ge
Zamil Abuzayd

Supervisor

Sandra Cowan 


Table of Contents
Scope........................................................................................... 3 Introduction.................................................................................. 4 Deliverables................................................................................. 5 Timeline....................................................................................... 6

Page 2

Scope
The following project plan outlines the problems and solution details that our team will be working towards achieving for the three case studies. We will make the time and cost calculation for those cases and find the answers for relative questions. All results and interpretations will be included in a final report. All the work will be completed by our team through online

discussion. We will discuss the three cases one by one, as in the following order:
Case 1: Database for Modesto Nuts minor league baseball team Case 2: A network plan study
Case 3: A cost-time graph study

Page 3

Introduction
The project plan here will be the brief introduction for all three cases and relative questions:
Case 1: Database for Modesto Nuts minor league baseball team We are developing a customer database for the Modesto Nuts minor league baseball team and development activities with predecessor relations are given. We will draw the project network and calculate the time parameters including activity slack. After the calculation done, we will analyze those parameters to check how long will this project take and whether the project schedule is sensitive or not?

Case 2: A network plan study
In this case, a network plan will be given. And based on that, firstly, we finish the time calculation and get the project duration. Secondly we will develop a loading chart for resources Carpenters and Electricians. Thirdly we finish the resource activity schedule. Finally by analyzing the resource activity schedule, we figure out the critical activity and adjust the project duration accordingly.

Case 3: A cost-time graph study
In this case the time and cost data of the project activities will be given, with an initial cost-time graph. We will finish the calculation of the total direct, indirect and project cost for each duration. After that, we will work out the optimum cost-time schedule for the project and get the final cost.

Page 4

Deliverables
The deliverables for this project are:
Case 1: Database for Modesto Nuts minor league baseball team  AON network with critical path and activity slack
 Answers for the three questions
Case 2: A network plan study
 network plan with all parameters
 resource schedule with all parameters
 Answers for the questions of new critical activities and old/new duration Case 3: A cost-time graph study
 A cost-time graph with all parameters
 Answers for the questions of optimum cost-time schedule and final cost

Expectations
Some expectations for this project:
 Outstanding discussion between team members.
 Participating from all team members.
 Good communication and interaction.
 Friendly approach and help with others
 Complete project within scope and on time by following the timeline.  Deliver final report before deadline.
 Have fun with the project

Page 5

Timeline
In this multi-cases project, we will discuss each case for 4 days before working on the final report:
Milestone

Start date

Completion date

Actual Complete

Project Plan

01/05/2015

01/05/2015

01/05/2015

Case 1

02/05/2015

05/05/2015

Case 2

06/05/2015

09/05/2015...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Ariane 5 Rocket Disaster Essay
  • Intro into Adam and Maroon 5 Essay
  • Failure and Fast Track Project Essay
  • Four Types of It Projects Essay
  • Maroon 5’s Ultimate Success Essay
  • Chanel No.5 Advertising Essay
  • Abandoned Construction Project Essay
  • Quality Management final project paper

Become a StudyMode Member

Sign Up - It's Free